Crumlin CHI
Project Overview
We delivered a new 220 m² MRI facility at CHI Crumlin, designed to seamlessly integrate with the existing hospital infrastructure. The project included the construction of an isolation room, waiting area, transfer room, control room, changing room, reception, and a DWC (disability-accessible toilet).
The MRI unit, a relocatable system, was installed on a raised concrete plinth. Works also included all necessary MEWP operations and full integration with existing electrical, data, water, and drainage networks. The facility was carefully tied into the live hospital environment with minimal disruption to ongoing services.
Have a Project In Mind?
All the best projects begin with a conversation – so reach out to us at JM Stenson Construction today and let’s take the first initial steps towards building your vision!
